Built Inside a Certification Body

Less chasing paperwork. More control over certification work.

Manage applications, audit planning, documents, approvals and surveillance in one connected system, built inside a working certification body.

Tell us what you want to improve. We'll show the relevant workflow and discuss what adoption would involve.

14

enforced phases

15+

generated forms

8

ISO standards

try.getcertiva.com
Try Certiva demoSynthetic company data

Certification record

Cascade Metal Fabrication Inc.

ISO 9001:2015 · UAF

Certificate active

Certification progress

9 of 9 complete

Application received

9 Sep 2025

Planning

10 Sep 2025

Quotation signed

12 Sep 2025

Agreement confirmed

15 Sep 2025

Document review

15 Sep 2025

Stage 1 audit

14 Oct 2025

Stage 2 audit

25 Nov 2025

Committee review

2 Dec 2025

Certificate issued

15 Dec 2025

Certificate expires

14 Dec 2028

Lead auditor

Anna Kowalski

Stage 1 & Stage 2

Verified in the live product demo
Certiva in practice

Built where certification work happens.

Certiva was developed in the team's own certification-body operating environment. That is first-hand product experience, not an independent customer endorsement. The organization is unnamed here.

A concrete workflow change

Manual handoff: Application details have to be carried into document templates. In Certiva: an application creates a case, and known details can populate prepared audit documents for staff review.

This is a product workflow example, not a measured result from the operating organization. We do not publish a time-saving figure or named customer case without supporting records and permission.

Adopting Certiva

How implementation works

The configuration and migration plan is agreed around your procedures and records before a launch date is set.

01

Review the fit

We review your standards, current workflow, accreditation requirements and the cases you need to manage.

02

Define the scope

Together we agree which templates and settings need configuration, which records can be imported and what remains manual.

03

Validate with your team

Relevant staff learn their roles and work through an agreed case before launch. Your team confirms that the configured flow matches its procedures.

04

Launch with support

We agree the launch sequence, responsibilities and support arrangements in the implementation proposal.

Your team supplies and approves its source records, templates and procedures. Import feasibility, manual cleanup, configuration limits, support terms and charges are specified in the proposal; they vary by implementation.

Buying questions

What to clarify before you adopt

Can we use our existing templates?

Certiva can prepare documents in a certification body's own templates. We review each template and agree the mapping and any adaptation before implementation.

What can be imported, and what requires manual work?

That depends on the format, quality and structure of your current records. We assess a sample, define the fields and files in scope, and identify anything that needs manual preparation or entry.

Who can access our data?

Access is organized by role, including separate workspaces for certification staff, auditors and clients. We review the proposed roles, hosting and data-handling terms with you before launch.

Can we export our records?

Documents can be downloaded from the workflows that produce them. We confirm the record types, formats and any bulk export requirements in the implementation scope.

What does onboarding include?

Onboarding is scoped around configuration, template mapping, agreed data preparation, training, workflow validation and launch support. The exact deliverables are set out in your proposal.

How are subscription, implementation and optional work charged?

We quote the subscription period and scope, implementation work and any optional custom work separately after reviewing your requirements. The proposal states charges and exclusions before you commit.

Purpose-built for certification bodies operating under ISO/IEC 17021-1.

Working Product

One live record for the entire certification.

Explore product views rebuilt from Certiva's working demo environment using synthetic company data.

One live record

Every stage visible. Every gate accounted for.

Follow a certification from application to certificate with the full evidence trail attached to the same record.

Built from the working demo
try.getcertiva.com
Try Certiva demoSynthetic company data

Certification record

Cascade Metal Fabrication Inc.

ISO 9001:2015 · UAF

Certificate active

Certification progress

9 of 9 complete

Application received

9 Sep 2025

Planning

10 Sep 2025

Quotation signed

12 Sep 2025

Agreement confirmed

15 Sep 2025

Document review

15 Sep 2025

Stage 1 audit

14 Oct 2025

Stage 2 audit

25 Nov 2025

Committee review

2 Dec 2025

Certificate issued

15 Dec 2025

Certificate expires

14 Dec 2028

Lead auditor

Anna Kowalski

Stage 1 & Stage 2

Why Certiva

Less administration. Stronger control.

Controlled workflow

The next step is clear.

Applications, planning, audits, reviews, decisions, certificates and surveillance stay connected through defined workflow gates.

Complete record

The case carries its documents.

Known case data can populate forms. Signatures, findings, evidence and approvals remain linked to the relevant record.

Audit-ready evidence

Evidence is easier to retrieve and review.

The system records workflow changes and related approvals, helping your team examine the basis for each decision.

CertivAI

Expert work, accelerated—not hidden.

CertivAI prepares the work and shows its reasoning. Your team reviews, changes, and approves every result.

  • Draft complete audit reports in your own template
  • Calculate defensible audit days and clause exclusions
  • Flag missing coverage and report gaps before submission
try.getcertiva.com/reports

AI report

Stage 2 report

JOB-CASCADE-2025-002

Report ready

Report ready

Standards

ISO 9001

Report context

Stage 2

Accreditation body

UAF

Company

Cascade Metal Fabrication

Evidence package

23 documents

Duration

8m 42s

Report ready

Generated in your DOCX template and ready for auditor review.

Download report

Multi-standard by design

Eight standards. One operating system.

ISO 9001ISO 14001ISO 45001ISO 27001ISO 22000ISO 13485ISO 37001ISO 50001

See your certification process inside Certiva.

Bring your standards and document set. We'll show you how the complete workflow fits your certification body.